Screw Pile Installation Services

Solidity provides specialist screw piling installation services across Australia, delivering reliable, precise, and highly efficient foundation solutions. We ensure your project’s success through the use of technologically advanced, company-owned machinery and experienced, in-house installation teams.

As your helical piling partner, we manage the entire installation process, guaranteeing full compliance with Australian standards and minimal site disturbance.

Why Choose Solidity for Screw Pile Installation?

Expert In-House Installation Teams

All installation work is performed internally by employees who receive comprehensive training from Solidity's senior staff. Our installers are screw piling specialists who are trained to complete your piling in a safe and time-effective manner.

Advanced, Company-Owned Equipment

Solidity utilises advanced installation equipment, which is owned, maintained, and operated by our team, allowing us to efficiently carry out pile installations and meet tight client schedules.

Rapid Installation Rates

With the adoption of technologically forward installation equipment, Solidity is able to conduct pile installs in quantities of up to 120 piles per day (per machine). This superior efficiency ensures we can handle projects of all scales, from small commercial works to large civil or solar farm installations, while providing short lead times.

An estimate for time required on site can be provided for a specific project upon request.

Compliance and Quality Assurance

We ensure full technical compliance for every pile installed.

  • Digital Logging: Installation records are digitally logged in full compliance with AS2159.
  • Engineering Review: These records are provided directly to the project engineer for necessary review.
  • Minimal Disturbance: Pile installation is conducted with minimal disturbance to the ground on site.
Helical Pile & Screw Pile Manufacturer

Solidity is a leading manufacturer of helical and screw piles, with all products manufactured entirely in-house at our Thomastown, Victoria, facility. Our process, overseen by our Manufacturing Manager, adheres to strict quality management and assurance procedures. We use robotic welding and CNC plasma profiling for precision and consistency. All welding procedures are compliant with AS/NZS 1554.1, with inspection and verification at each stage. We exclusively use Australian-supplied C350 grade steel. Our galvanised piles are inspected in accordance with AS/NZS 4680, and test certificates and detailed project MDRs are available upon request. This process ensures we can offer short lead times even for custom projects.

Quality Materials

We exclusively use Australian-supplied C350 grade steel for all piles. Each completed pile is inspected for compliance with welding standards. Full material traceability records are available, and test certificates for pile shafts and plates, as well as detailed Material Data Reports (MDRs), can be provided on request.

Efficient Production & Ready Stock

Our streamlined manufacturing process can produce up to 6,000 screw piles per month (based on 2 m x 76 mm piles), ensuring short lead times for standard and custom projects. To ensure timely production, we maintain up to 200 tonnes of pipe material and sufficient plate material for over 1,200 standard-sized helix plates at any time.

Compliance & Sustainability

All designs and manufacturing meet AS2159-2009 requirements, ensuring quality and safety. We use 100% Australian-made steel, which not only supports local content but also helps meet sustainability targets. Furthermore, our installation methodology is designed to reduce spoil and minimise environmental impact.

Our Installation Equipment Fleet

We can deploy a range of equipment sizes to suit various site access requirements and single pile lengths. Below are the common equipment sizing and operating weights utilised by Solidity:

Machine Operating Weight
Machine Configuration
Minimum Access (Width)
Maximum Reach (Single Pile Length)
1.7T
Zero Tail Swing
1000mm
2.0m
3.5T
Zero Tail Swing
1900mm
4.0m
5.5T
Zero Tail Swing
2100mm
5.0m
8T
Reduced Swing
2500mm
6.0m
15T
Conventional Swing
2700mm
8.0m
21T
Conventional Swing
3000mm
8.0m
30T
Conventional Swing
3200mm
10.0m
Machine Operating WeightMachine ConfigurationMinimum Access (Width)Maximum Reach (Single Pile Length)
1.7TZero Tail Swing1000mm2.0m
3.5TZero Tail Swing1900mm4.0m
5.5TZero Tail Swing2100mm5.0m
8TReduced Swing2500mm6.0m
15TConventional Swing2700mm8.0m
21TConventional Swing3000mm8.0m
30TConventional Swing3200mm10.0m

Selected Installation Projects

We can deploy a range of equipment sizes to suit various site access requirements and single pile lengths. Below are the common equipment sizing and operating weights utilised by Solidity:

GMCT-AMP Entry Precinct Improvements


  • Project Details: Altona, VIC, for Unyte.

  • Scope: Installation of 768 screw piles, utilising multiple shaft sizes (88.9mm, 114.3mm, 141.3mm) to suit various structural demands.

Swan Hill Art Gallery Redevelopment


  • Project Details: Swan Hill, VIC, for Keyystone Building Group.

  • Scope: Installation of 117 screw piles, including 141mm and 219.1mm shaft piles, plus custom screw pile caps.

Limondale Solar Farm BESS


  • Project Details: Balranald, NSW, for Symal Infrastructure.

  • Scope: Large-scale installation of 864 piles and 864 caps for BESS foundations.

Integrated Services for Project Success

Installation is the final step in our holistic approach, where we partner with clients from start to finish. Our end-to-end service includes:

  • Design/Engineering: Expert consulting and in-house pile designs compliant with AS2159-2009.
  • Manufacturing: Helical piles manufactured exclusively from Australian C350 Grade steel in our Solidity Pile Manufacturing Facility in Thomastown, Victoria.
  • Testing: Static Load testing on piles for the purpose of development, verification and investigation.

Frequently Asked Questions

How many screw piles can Solidity install per day?

Installation rates can reach up to 120 piles per day per machine.

Do you use your own equipment for installation?

Yes, the installation of Solidity Helical Piles is carried out utilizing machinery that is owned, maintained, and operated by the Solidity team.

Are installation records compliant with Australian standards?

Yes. Installation records are digitally logged in full compliance with AS2159 and provided to the project engineer.

What is the maximum single pile length your equipment can handle?

Our largest 30T conventional swing machine has a maximum reach of 10.0m (single pile length).

Do you offer installation services outside of Victoria?

Yes, we provide installation and project management services anywhere in Australia - including Victoria, NSW, SA, QLD, NT, WA and Tasmania.

What pile finishes are available?

Raw, painted, and galvanised. Our team can advise on the best finish for your site.

Ready to ensure the most efficient and compliant foundation installation for your project?

Contact Solidity today to receive an estimate for the time required on site and discover how our expert installation team can deliver precision and reliability.